Maxvolt Energy Begins Work on Rs 700 Crore Aligarh Battery Facility

Two-phase expansion to add 10 GWh manufacturing capacity across multiple applications.

23 Sep 2026 | 1480 Views | By Dev Vadchhedia

Maxvolt Energy Industries announced that it has commenced development work on a Rs 700 crore advanced battery manufacturing facility in Aligarh, Uttar Pradesh.

Spread across approximately 23,576 square metres (nearly six acres), the plant will be executed in two equal phases of 5 GWh each to take the site's planned annual capacity to 10 GWh. Together with the company's existing operational facility in Duhai, the project will expand Maxvolt's total planned manufacturing base to 12.5 GWh per year.

What the Maxvolt Aligarh Plant Will Manufacture

The facility will produce battery solutions ranging from 1 kW to 5 MW, incorporating battery management systems designed for standard alternating current charging as well as level three and level five direct current fast charging. The project will add dedicated OEM assembly lines, while extending the company's manufacturing footprint into four-wheeler electric passenger vehicle packs alongside its established two-wheeler, three-wheeler, telecom backup, and stationary energy storage operations.

Revenue Potential, Jobs and the Two-Phase Rollout

At full operational scale, Maxvolt claims that the project carries an estimated annual revenue potential exceeding Rs 6,800 crore and is projected to generate between 1,500 and 2,000 direct jobs and up to 10,000 indirect employment opportunities across manufacturing, engineering, logistics, and testing.

Sachin Gupta, Co-Founder and Chief Operating Officer, Maxvolt Energy, said, "Two phases of 5 GWh is an operating decision before it is a financial one. Commissioning a plant of this size in a single step means validating every line, every supplier and every test protocol at once. Phasing lets us prove the first 5 GWh in live production, carry those learnings into the second, and keep the supply chain ramping at a pace it can actually hold."

RELATED ARTICLES

Suprajit Engineering Q2 Profit Rises 5% To ₹53.4 Crore

Eshisha Java 07 Nov 2026

Suprajit Engineering reports a 21% increase in consolidated revenue for Q2 FY27, while higher expenses and a sharp decli...

SAEINDIA To Host APAC 23 Automotive Engineering Conference In New Delhi

Autocar Professional Bureau 07 Nov 2026

The November 13–14 conference is expected to bring together over 1,000 delegates, 500 mobility experts and 80 exhibitors...

Remsons Industries Q2 Revenue Rises 17%, Pre-Tax Profit Falls

Eshisha Java 07 Nov 2026

Remsons Industries reported higher consolidated revenue in Q2 FY27, but expenses grew faster, reducing pre-tax profit. C...

NEXT STORY