CG Power and Industrial Solutions seeks nod for setting up semiconductor assembly, test facility
The estimated investment in the project is $791 million over a 5-year period.
CG Power Industrial Solutions has filed an application with the Ministry of Electronics and Information Technology (MeitY), seeking approval to set up an Outsourced Semiconductor Assembly and Test (OSAT) facility, and grant of a subsidy.
The estimated investment in the project is $791 million over a 5-year period, noted the press release.
Subject to the subsidy being approved, CG Power Industrial Solutions, a subsidiary of Tube Investments, in the Murugappa Group, proposes to implement the same as a joint venture in partnership with technology providers/anchor customers, which are under discussion.
RELATED ARTICLES
Government Commences High Ethanol Blend Rollout Across 48 Petrol Pumps Throughout India
The localized fuel distribution network targets lower retail pricing and reduced crude oil import costs via specialized ...
SIAM Hosts Sixth International Climate Action Conference to Chart Low Carbon Automotive Transition
Industrial leaders and policymakers at the World Environment Day summit outline multi-fuel pathways, circular manufactur...
Ammann India Appoints Prashant Morankar as Head of After Sales Division
The long-standing company executive takes charge of nationwide aftermarket operations to optimize equipment lifecycle su...


By Autocar Professional Bureau
23 Nov 2023
10214 Views
