CG Power and Industrial Solutions seeks nod for setting up semiconductor assembly, test facility
The estimated investment in the project is $791 million over a 5-year period.
CG Power Industrial Solutions has filed an application with the Ministry of Electronics and Information Technology (MeitY), seeking approval to set up an Outsourced Semiconductor Assembly and Test (OSAT) facility, and grant of a subsidy.
The estimated investment in the project is $791 million over a 5-year period, noted the press release.
Subject to the subsidy being approved, CG Power Industrial Solutions, a subsidiary of Tube Investments, in the Murugappa Group, proposes to implement the same as a joint venture in partnership with technology providers/anchor customers, which are under discussion.
RELATED ARTICLES
Global ICE Share May Fall to 23% by 2035; JSW MG Backs Flexible ADAPT Platform: Parth Jindal
The architecture can support battery-electric, plug-in hybrid, range-extended electric and hybrid vehicles as markets mo...
Gabriel India to acquire stake in HL Klemove India for ADAS
Gabriel India will acquire a stake in HL Klemove India for about ₹935 crore to develop ADAS, autonomous driving and auto...
Maruti Suzuki Starts Rail Vehicle Dispatches to Pollachi Terminal
Maruti Suzuki has started rail dispatches to Pollachi terminal in Tamil Nadu, with the facility set to support over 11,0...


23 Nov 2023
10370 Views
Prerna Lidhoo
