CG Power and Industrial Solutions seeks nod for setting up semiconductor assembly, test facility
The estimated investment in the project is $791 million over a 5-year period.
CG Power Industrial Solutions has filed an application with the Ministry of Electronics and Information Technology (MeitY), seeking approval to set up an Outsourced Semiconductor Assembly and Test (OSAT) facility, and grant of a subsidy.
The estimated investment in the project is $791 million over a 5-year period, noted the press release.
Subject to the subsidy being approved, CG Power Industrial Solutions, a subsidiary of Tube Investments, in the Murugappa Group, proposes to implement the same as a joint venture in partnership with technology providers/anchor customers, which are under discussion.
RELATED ARTICLES
MINI India Eyes 2x Growth Through New Countryman SUV, Localisation Push and Network Expansion Strategy
After years as a niche luxury brand, MINI India is pursuing its most ambitious expansion strategy yet. Can the bigger Co...
Renesas Acquires Pictorus to Expand Cloud-Based Embedded Software Development Capabilities
Acquisition of California-based software developer Pictorus strengthens Renesas 365 platform with behavioral modelling, ...
Renault Group Assumes Full Ownership of Flexis Electric Van Joint Venture
The French automaker consolidates its holding by purchasing remaining shares from Volvo Group and CMA CGM following regu...


By Autocar Professional Bureau
23 Nov 2023
10235 Views
Prerna Lidhoo
