Built for 30,000, Running at 6,000: Godrej's New Forklift Plant is Waiting for India to Catch Up
The 63-year-old business has moved almost all production to a new plant and is already engineering sodium-ion batteries and driverless trucks for what comes next.
Godrej Material Handling, a part of Godrej Enterprises Group, has almost completed relocating its material handling equipment manufacturing from its historic Vikhroli campus in Mumbai to a new greenfield plant in Khalapur, about 70 km from Mumbai. The company invested approximately Rs 350 crore in a facility designed to increase annual capacity fivefold and anchor its bet on India's manufacturing ambitions for years ahead.
The transition, executed line by line over seven to eight months to avoid disrupting supplies, is now about 98% complete, according to Anil Lingayat, Executive Vice President and Business Head of Godrej Material Handling, who ...
RELATED ARTICLES
India's Great Tyre Build-Out
India’s tyre makers are entering a Rs 18,000-crore investment cycle as factories run near capacity and demand shifts tow...
Local Powertrain Manufacturing, Product Mix Change Drive 8.9 Percent Net Profit Growth at CNH India
In-house assembly at Pithampur yields a 20 percent engine procurement cost advantage as global supply chains face headwi...
JCB India Targets Farm Logistics, Bridging the Gap Between Tractors and Backhoes
JCB India eyes a 20,000-unit addressable agri-handling market to formalize farm-gate logistics with factory-built altern...



08 Sep 2026
Autocar Professional Bureau

Shahkar Abidi